华中建机中文版WhatsApp: +86-13733150737

ASK

13
October
How to Lubricate the Running Gear of Gantry Crane 1. To open reducer vent cap at first use is necessary, because it can promise good aeration and relief inner pressure. 2. Before work, oil level height of reducer should be checked. If it i ...
13
October
When an enterprise is selecting the lifting crane, not only the hoisted objects but also the actual requirements should be taken into consideration comprehensively. In this way, we can save the cost and guarantee the successful operation. However how ...
13
October
1).the cooler must be started when the machine start. 2).if the oil temperature exceeds 75℃ for a long time, the machine is stopped to make the heat radiate, and working intermittently. As usual, only the worker operates correctly, the o ...
13
October
Today, ZZHZ will tell you some points that you should pay attention to when the gantry crane is working, and some correct operation procedures. ...
13
October
It is prohibited to use steel wire rope as ground cable as welding of gantry crane; ...
13
October
Installation Steps of MGH120/5-35-14 Gantry Crane ...
13
October
Things About Gantry Crane ...
13
October
How to operate the bridge girder launcher? ...
11
October
How to Choose the Most Suitable Crane? Any question, contact us today for more information. ZZHZ team are here to fit your application. Email: zzhz114@gmail.com Tel: 86-371-68000000 ...
11
October
This article is telling you something about painting method for gantry crane. Contact Us: zzhz114@gmail.com Tel: 86-371-68000000 Website: zzhz.com ...
10
October
Electric system for gantry crane ( elevator machines )includes each control device, guard switchboard, emergency switch, bell button and etc., which is always located in operating cab. When electric system is open-air, please remember to ins ...
10
October
gantry crane, bridge girder launcher, overhead crane, batching plant manufacturer in China ...
10
October
Checking the connections of components every week, the parts includes the bolt and nut of connecting plate of main girder, main girder and legs, frame and legs, and corbels etc. If the bolt or nut needs to be replaced, the strength, grade an ...
10
October
Install crane rails Install crane moving mechanism check and install main girder sections on the ground lift and install bottom cross girder lift and install support leg standing column install main girder lift and install trolley mechanism install l ...
10
October
Gantry Crane: Precautions and Storage of Steel Structure Components Disassembly ...
07
October
The general power shall be cut off before test run and check the crane according to the following content. All the parts should be totally completed ...
30
September
Hoisting Machinery: How to Use and Maintain in Run-in Period What is a run-in period? Run-in period, also called first-used period after leaving factory, which is stated according to the initial technical features of mechanical equipment ...
27
September
How to reach crane's maximum potential ...
26
September
The advantage of Upstroke Mss Bridge Creating Machine 1、It can make the legs through hole to move automatic, without other auxiliary crane equipment, which makes it higher degree mechanization, simple operation and safety. 2、The to ...
23
September
Indroduction about the frequency converter: The universal frequency converter adopts the newest control power appliance made from semi-conductors. Influenced by temperature, humidity, vibration, time and other surrounding conditions, freque ...