Preparation Work for 900t Gantry Crane for Lifting Girder
 
In this article, ZZHZ will introduce tips about the preparation work for 900t gantry crane for lifting girder as following:
 

A.Expected Constructors
 
1.Project manager ------ 1
2.Deputy project manager ------ 1
3.Electrician ------ 2
4.Safety guard ------ 1
5.Crane operator ------ 4
6.Labor ------ 16
7.Welder ------ 3
8.Logistics ------ 2
In total: 30 staff are needed.
 
B. Tools to be prepared:
 
1. 200t truck-mounted crane ------ 2
2. 80t truck-mounted crane ------ 1
3. 16t Lead-screw jacking ------ 2 
4. 32t lead-screw jacking ------ 2
5. 10t snap ring ------ 8
6. 5t snap ring ------ 4
7.Rope clip in φ21.5mm ------ 80
8.28m steel wire rope in φ21.5mm ------ 8
9.16m rope in φ32mm ------ 4 
10.16m rope in φ21.5mm ------ 4
11.13m rope in φ43mm ------ 2
12.Sleeper in 20×250×2500 ------ 400
13.Inter phone ------ 4
14.Chain block in 10t ------ 8
15.Measuring instrument, gradient and transit ------- each is 2
16. 3t & 5t chain block ------ each is in 1
17.Coir rope in φ25 ------ 100m
18.Hemp rope in φ20 ------ 1 bundle
19. Torque Wrench (750-1500) ------ 1 bundle
20.Pullover 50,46,41,36 ------ each is 2
21.Spanner in 12 inch ------ 2 bundles
22. Chave Combinada 50,41 ------ each is 2 bundles
23.Spanner in 18 inch ------ 2 bundles
24.Steel tap in 50m ------ 1 bundle
25.Abrader in φ100 ------ 2 sets
26.Bishop in 1 pound ------ 2 bundles
27.Mallet in 12 pound ------ 1 bundle
28.Electric welding machine ------ 1 
29.Gas cutting ------ 1 
30.Crow bar in 1.2m ------ 4
31.Safety belt ------ 10

Email: zzhz114@gmail.com     Tel: 86-371-68000000