MGHZ1200 gantry crane  is  the hoisting equipment for  large-scale bridge. In order to make sure the contiue operation and safety of workers, so the daily check is very 1200t gantry crane for lifting girderimportant.

At least the connection of parts completely every month which including connecting plate of main girder, main girder and legs ,bolts and nut. If they have questions , the operator should stop the machine and deal with it timely.The bolt and nut need to be replaced,but the strength and specification is the same to the original requirements. And the checking should be done every week.

The main welding lines need to be checked : upper and down cover board of main girder and web  plate, the vertical welding line of rigid legs and flexible legs,the lines between rigid and flexible legs  and upper or crack or not. the operator should stop the machine when finding the problem . if the workers find crack by eyes, but can’t judge the dangerous degree which should be checked by welding inspection instrument.

 

MGHZ1200 gantry crane  is  the hoisting equipment for  large-scale bridge. In order to make sure the contiue operation and safety of workers, so the daily check is very important.

At least the connection of parts completely every month which including connecting plate of main girder, main girder and legs ,bolts and nut. If they have questions , the operator should stop the machine and deal with it timely.The bolt and nut need to be replaced,but the strength and specification is the same to the original requirements. And the checking should be done every week.

The main welding lines need to be checked : upper and down cover board of main girder and web  plate, the vertical welding line of rigid legs and flexible legs,the lines between rigid and flexible legs  and upper or crack or not. the operator should stop the machine when finding the problem . if the workers find crack by eyes, but can’t judge the dangerous degree which should be checked by welding inspection instrument.