As installing bridge girder launcher but the guide beam suspending in the air, bridge girder launcher

main girder has a larger stress at position of rear middle support leg,

max stress 204.7Mpa < allowable stress 240Mpa, strength meets the demand.

Max downward displacement at front part 53.14cm, allowable displacement

in China specification S/100=59.64cm, stiffness meets the demand. The value

should be considered as designing front leg. Buckling ultimate load

multiplier 1.535, strengthen main girder web plate at rear middle support leg.