How to install the overhead crane(Part II)?
1、 Electric hoist of overhead crane can be installed on the main girder in advance, then mount on the rail, respective installation is also allowed
2、 Cabin can be connected before crane mounting on the rail or after. Concrete details should refer to site conditions
3、 Power sliding contact line device can be set up in accordance with figure 3 and
figure 4
4、 Connect all the electrical lines according to electrical diagram, after installation, crane must move to the direction that is set by control button
5、 Referring to figure 9 and table 5, users can set up resistance device and safety controller.
9、Control cabin installation refers to figure 1, firstly install connection support 2 and cross girder with bolts, then connect connection 2 and 3 after connecting link frame 4 with control cabin