Gantry crane is the most familiar equipment for lifting load for construction site. As to hoisting, site layout is a vital period and different circumstances have different influences on the machinery operation. A suitable site arrangement is tightly connected with lifting. On the construction site, the operators should consider matters as following:
 
1. Select right lifting position, so that it can realize amplitude, rotating and lifting to complete lifting mission.
2. The arrangement of construction site must reduce the distance of lifting and transportation and times of loading and unloading.
3. The whole construction site must consider construction safety, safe position of conductor and safe distance of surrounding equipments.
4. According to the characteristics of lifting, it is necessary to decide where are the best positions for erecting, moving, demounting of derrick mast and installation site for winch.
5. If working in the flammable and combustible area, the operators should abide by relative safety rules of hoisting work.
6. It is important to consider the position of transportation, assembly and hoisting for the crane.
 