HZQ40/160 walking type bridge girder launcher is a new model launching gantry which designed by ZZHZ. bridge girder launcher for tunnel

The foundation must be done well before erecting girder:

1.    the digging of foundation ditch

the foundation ditch is dig by excavator, the rock which can’t be dig by excavator adopts pneumatic pick  crushing etc.
2. basement

when the basement is dry, making it wet. When the basement is rock, wetting and packing a layer 2~3cmcement.