(1)Turndown the whole circuit, ensure the installation of gantry crane meet the requirements.

(2)Check the following parts:

a、If the steel structure become deformed, welding seam crack.lifting girder gantry crane

b、To refuel the lubrication point.

c、The whole running gear move flexible.

d、Fasteners solid connection.

e、Qualified gear connection;

f、Acceptable brake installation.

g、No obstacle for crane moving.

h、Whether the steel rope intersect or knot. The rope length coincide with the lifting height.

(3)Ground connection requirements:

a、Reliable electrical connection is needed for the steel structure.

b、Check the circuit and insulation resistance of electrical appliance

c, Check the wiring connection after cutting power.