7. The quality control in Rail mounted Container Gantry Crane manufacturing process

The process documents, drawing and schemes are handed out to production department. After considering those documents carefully, the production department together with quality and check department arrange the manufacturing, control, test and acceptance.
The workers do the following works in light of the drawing:
Prepare the material according to relevant workmanship.
Doing the welding and make the record.
Manufacturing refers to the workmanship technology.
Do the record on the quality control of spare parts
Assembly and installation
Control the total geometry dimension and make the test record of key parts.

8. The drawing of Rail mounted Container Gantry Crane



Click to download of Rail mounted Container Gantry Crane

9. Tracing data and leaving factory data of Rail mounted Container Gantry Crane

  Contract, Evaluation Documents, Drawing, Production Instructions, Installation Scheme, Material Quality Specification, Product Quality Checking Sheet, Welded Seam Detection Report, Quality Certificate of Purchased Parts.
  Appearance file: Instruction, Installation scheme, Quality Certificate, Checking and Acceptance Report.